A quote is often the first real thing a customer sees from your business. It sets the price, but it also sets expectations: what's included, what isn't, when the work happens and what happens if something changes. Most disputes on small jobs come back to a quote that was vague in one of those places. This guide covers the difference between a quote and an estimate, what a good quote includes, the New Zealand consumer law that sits behind it, and how to deal with changes once the job is under way.
Quote or estimate: know which one you're giving
The two words get used loosely on site, but they mean different things to a customer and to the law.
A quote is a firm price
A quote is an offer to do a defined piece of work for a set price. Once the customer accepts it, that price is what you've agreed, as long as the work stays the same. If you find something unexpected, you can't just charge more; you need to agree a variation (more on that below).
An estimate is your best guess
An estimate is an informed guess at what the job will cost. It's the right tool when you genuinely can't know the full scope until you start, such as fault finding, repairs behind walls or work on an old building. The final bill can differ from the estimate, but it should still be reasonably close to it, and you should tell the customer as soon as you can see it's going to run over.
If you're giving an estimate, say so clearly on the document, explain what could change the price, and consider giving a range or a "we'll check in before going over" point. The Commerce Commission (opens an external site) and Consumer NZ (opens an external site) both have plain guidance on how customers are told to read quotes and estimates, which is a useful way to see your paperwork from the other side.
What to put in a quote
A good quote answers the questions a customer will otherwise ring you about, or argue about later.
Scope of work
Describe the work in plain language: what you'll do, where, and to what standard. "Replace deck" is a recipe for a dispute. "Remove the existing deck at the rear, supply and install a new 24 square metre H3.2 pine deck with stainless fixings, steps to the lawn, and take the old timber away" is not.
Exclusions and assumptions
List what isn't included, so it's clear. Common examples are consent fees, making good after other trades, rubbish removal, painting, and anything hidden that you haven't been able to inspect. Write down your assumptions too: access to power and water, the site being clear, a particular start date, or the existing framing being sound.
The price, and whether GST is included
Break the price down enough that the customer understands it, even if you don't show every line. Say clearly whether prices include GST. If you're GST registered, quoting GST exclusive to a homeowner and adding 15% at the end is a common source of upset; many trades quote homeowners GST inclusive for that reason. The GST basics post covers registration and the rate.
Optional extras
If there are sensible add-ons, such as an upgraded fitting, extra outlets or a better finish, list them as options with their own prices. It lets the customer choose without you having to re-quote, and it often lifts the value of the job.
Validity and timing
Say how long the price holds. Material prices move, and a quote accepted six months later may no longer stack up. Thirty days is common for smaller work. Give a likely start date or lead time and a rough duration, and say what it depends on, such as weather or other trades.
Payment terms and stages
Set out when you'll invoice and when payment is due. For bigger jobs, that might be a deposit to secure materials, progress payments at agreed stages and a final payment on completion. Agreeing this up front makes getting paid far easier.
How changes will be handled
Say that any change to the scope will be priced and agreed before the work is done. One sentence here saves a lot of awkward conversations.
Your terms
Attach or link your standard terms: warranties, what happens if the customer cancels, ownership of materials until paid, and access. Keep them readable. Terms the customer never reads won't help you much if there's a disagreement.
The consumer law behind your quote
This is a short summary in general terms, not legal advice. Check the source or a lawyer for your situation.
Consumer Guarantees Act 1993
When you provide services to a consumer, the Consumer Guarantees Act (opens an external site) gives them guarantees that apply whatever your paperwork says. In summary, the work must be done with reasonable care and skill, be fit for any particular purpose the customer made known to you, be finished within a reasonable time if no time was agreed, and cost a reasonable price if no price was agreed. That last one is another reason to agree a price or a clear basis for charging before you start.
Businesses supplying other businesses can agree to contract out of the Act, but only in writing, where both are in trade, and where it's fair and reasonable to do so. You can't contract out with a homeowner.
Fair Trading Act 1986
The Fair Trading Act (opens an external site) prohibits misleading or deceptive conduct in trade. For quotes, that means no misleading statements about the price, what's included or how long it will take. An advertised "from" price that nobody could actually get, or a quote that quietly leaves out something you know the job needs, can be a problem.
The Act also has rules against unfair terms in standard form contracts with consumers, and with small businesses. If you use the same terms for every customer, it's worth checking they're balanced. The Commerce Commission's business guidance (opens an external site) explains how this works.
Residential building work
If you're doing residential building work, the Building Act 2004 (opens an external site) adds requirements. At the time of writing (November 2026), residential building work of $30,000 or more including GST needs a written contract, and before the contract is signed you must give the client the prescribed disclosure statement and checklist. Clients can also ask for these on smaller jobs. The contract has to cover set matters, including how variations will be handled. building.govt.nz (opens an external site) has the details and templates.
Variations: change the price before you change the job
Most jobs change. The customer wants an extra outlet, you find rot behind the cladding, or the supplier can't get the product you quoted. The rule that saves money and friendships is simple: write the change down and agree the price before you do the work.
- Describe what's changed and why.
- Price it, including any time the change adds.
- Get the customer's agreement in writing. A reply to an email or a text is far better than a nod on site.
- Keep a record against the job so it ends up on the invoice.
For more on this, see managing variations and extra work.
Pricing the quote properly
A quote is only as good as the numbers behind it. Work from your real labour rate, including the time you can't charge for, and real material costs plus a markup that covers your handling and risk. Our post on pricing your labour rate goes into that. After the job, compare what you quoted with what it actually cost, so the next quote is better.
Quoting in Tavo
Tavo's quoting builds quotes from your own price book, with a markup on each line, optional extras the customer can tick, and "not included" lines so exclusions are clear. Each quote has a validity date (30 days unless you change it). The customer gets a link, picks the extras they want and accepts by typing their name, and an accepted quote becomes a job with its budget carried across, so you can see how the job tracks against what you priced.
Want to try it on your next quote? Tavo is free for 14 days, no card needed.
This post is general information, not legal, tax or employment advice. Rules and rates change, so check the official source linked above or talk to an adviser, such as your accountant or a lawyer, before relying on it. Spotted something out of date? Let us know.