Tavo for heat pump and hvac installers
Job management for heat pump and HVAC installers
Heat pump and HVAC work is a steady run of supply and install jobs and service call outs. Tavo keeps the unit, the install hours and the invoice on each one.
Supply and install, again and again
Most heat pump businesses run on supply and install jobs: a high wall unit in a living room, a multi room system, a ducted system in a new build, or a ventilation system. Many weeks are back to back installs, two or three a day, with service and repair call outs fitted in between.
Each supply and install job has a unit or two from your supplier, brackets, pipe and cable, the electrical connection (yours or an electrician's), and the install labour. They're usually fixed price. Service and repair call outs are usually charged up.
In Tavo, fixed price jobs are measured against the accepted quote, and charge up jobs are invoiced from the time and materials recorded on them. With lots of similar jobs, the job profit and by job type reports quickly show which install types make money and which don't.
Quoting heat pump installs
Heat pump quotes are often compared side by side, so they need to be clear. In Tavo you build them from your price book: the unit, the install kit, labour, and any extra pipe runs. Each line has your cost and markup, so you can see the margin on every unit you sell.
Options the customer might want go on as optional extras: a wifi controller, a condensate pump, an outdoor unit stand or a longer back to back run. The customer ticks what they want on the quote link, sees the total change, and accepts by typing their name. Things you're not doing, such as switchboard upgrades or building work, go under "Not included".
Quotes are valid for 30 days by default, which you can change, so old supplier prices don't come back to bite you. See quoting.
Units on order and the install day
On supply and install work, the unit is the biggest cost and the thing most likely to hold up the job. Raise a purchase order against each job for the unit and kit, with the date you need it by. Late deliveries show on the home screen. Mark it received when it arrives, and charge the supplier's bill to the job, or split one bill across several jobs.
On the day, your installers see their jobs on their phones with the address, access notes and the customer's phone number. They clock on to each install, switch to the next one, and take photos of the finished unit and the outdoor placement. If the electrical connection is done by a subcontractor, their invoice goes on the job as a cost.
The job's money tab then shows the unit, kit and install hours against the quote.
The parts of Tavo heat pump and hvac installers use most
Quoting
Quote supply and install with extras like a wifi controller or condensate pump that the customer ticks online.
Purchase orders and bills
Order units against each job and split one supplier bill across several installs.
Staff app
Installers clock on to each install from their phones and switch jobs as they go.
Scheduling
Book back to back installs and fit service call outs around them.
Reports and exports
Compare margins by job type, such as single high wall installs against ducted systems.
What Tavo doesn't do yet
- Tavo doesn't send recurring service reminders or schedule annual servicing automatically.
- There are no refrigerant records or commissioning sheets. Attach your own documents to the job's files.
- Tavo doesn't track serial numbers or warranty registrations for units.
- There's no SMS, online card payment or GPS tracking.
Need one of these? Tell us. It helps us decide what to build next.
Further reading
How to choose job management software for a small trade business
A practical guide for small NZ trade businesses: what problems to solve first, the features that matter, questions to ask, and how to run a fair trial.
Purchase orders and supplier bills for trade businesses
Why purchase orders matter for NZ trade businesses, how to check orders against deliveries and bills, and how to put every supplier cost on the right job.
Pricing your labour rate as a NZ tradie
How to work out a labour rate that covers your costs as a NZ tradie: the real cost of an hour, overheads, non-chargeable time, utilisation and a fair profit.
See it with a real week of jobs.
Try Tavo free for 14 days. No card needed. Bring your crew in on day one and run your next quote, job and invoice through it.

